
{"id":106,"date":"2016-08-04T12:44:34","date_gmt":"2016-08-04T12:44:34","guid":{"rendered":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/?p=106"},"modified":"2016-08-04T12:44:34","modified_gmt":"2016-08-04T12:44:34","slug":"gerbera-ltd-high-rise-construction","status":"publish","type":"post","link":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/2016\/08\/04\/gerbera-ltd-high-rise-construction\/","title":{"rendered":"Gerbera Ltd. ~ High Rise Construction"},"content":{"rendered":"<p style=\"text-align: left\" align=\"center\"><span style=\"color: #000000;font-family: Calibri\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Rachael here!\u00a0 Today we met with a man that could be considered a developer.\u00a0 He buys land and builds mixed use high rise buildings under the business of Gerbera Ltd.\u00a0 They usually contain commercial stores at the ground level with basements for the stores use and condos on the remaining floors.\u00a0 The number of floors ranges, we saw the construction of a twelve story mixed use high rise.\u00a0 Once he is done building the structures, he will sell each individual space to a company or family, however he fronts all the money himself first.\u00a0 In this way, he is essentially the owner and sells his property.\u00a0 At the beginning of his business, when he did not have such capital, he would have the eventual owners pay in increments beginning at the design phase all the way through to the signing of ACT 16 (certificate of occupancy).\u00a0 <\/span><\/p>\n<p><span style=\"color: #000000;font-family: Calibri\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 He has a unique way of organizing and operating his business.\u00a0 First, all the construction crew members are his own employees and he groups them into specific jobs.\u00a0 There will be a crew that does all the ground zero work (up until the ground level), another group that does floor slabs, another that does stucco, etc.\u00a0 And he will not pay them until 100% of the work in that building is completed.\u00a0 In handling it this way, he has found that the groups push one another to work efficiently and to stay on schedule because if one group is going slow, then the other group cannot start their job and therefore they cannot get paid.\u00a0 He also keep different projects at different construction phases.\u00a0 One building will be at the ground zero phase, another at the floor slab phase, another at the stucco phase, etc.\u00a0 This allows for there to always be at least one complete team working at all times.\u00a0 Usually they start one building and then the ground zero crew starts another and so on.\u00a0 There is one crane that is set on railroad tracks and is used as the crane for all the different buildings in the lot.\u00a0 In this fashion it is very efficient that the crane does not have to be repositioned for every building.\u00a0 He has about 20 high rise structures being constructed at one time.\u00a0 The only job that he contracts out is the roofing work because that is a very delicate and involved process.\u00a0 <img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-109 aligncenter\" src=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0621-300x200.jpg\" alt=\"DSC_0621\" width=\"300\" height=\"200\" srcset=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0621-300x200.jpg 300w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0621-768x512.jpg 768w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0621-1024x683.jpg 1024w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0621-1200x800.jpg 1200w\" sizes=\"auto, (max-width: 300px) 85vw, 300px\" \/><\/span><\/p>\n<p><span style=\"color: #000000;font-family: Calibri\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Since it is high rise building, the process of construction can take a very long time.\u00a0 There is foundation work, column work, floor slabs and a great deal more area to construct.\u00a0 Gerbera Ltd has come up with an ingenious way to save time.\u00a0 They call it a drawer system.\u00a0 It is where they frame out a floor slab, pour the slab, wait the 11 days to get early strength, then slid the forms out with a crane and place the forms (still intact and constructed) on the next story.\u00a0 They entire process takes about 14 days and therefore they are able to pour two stories a month.\u00a0 This is possible because they make each floor a beamless slab and if they do need a beam, they invert it.\u00a0 This requires more reinforcement but it saves time so the cost more than likely balances out.\u00a0 They have no way of making the columns more efficient; they must have two columns that run the entire height of the structure in both directions to help brace the system since it is not a steel braced structure.\u00a0 <img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-108 aligncenter\" src=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0619-300x200.jpg\" alt=\"DSC_0619\" width=\"300\" height=\"200\" srcset=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0619-300x200.jpg 300w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0619-768x512.jpg 768w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0619-1024x683.jpg 1024w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0619-1200x800.jpg 1200w\" sizes=\"auto, (max-width: 300px) 85vw, 300px\" \/><\/span><\/p>\n<p><span style=\"color: #000000;font-family: Calibri\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Another cool feature of the buildings is that they keep a 20 cm gap between each and fill it in with light weight foam to protect against earthquakes.\u00a0 Therefore, each building\u2019s foundation is independent from the buildings adjacent and in the event of an earthquake, all the buildings would move in the same direction but they would be independent from each other.\u00a0 <\/span><\/p>\n<p><span style=\"color: #000000;font-family: Calibri\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 We also visited a concrete plant and were able to see the operating room and stockpiles of materials.\u00a0 This particular plant had 10 recipes that varied for use like foundation, walls, high strength, etc.\u00a0\u00a0 They are also able to create a custom recipe based on client request and in that event they would make a sample batch and test it before sending any concrete to the site.\u00a0 They have their own testing facility at the plant and they make cubes (not cylinders like the US) and cure them in a lime bath.\u00a0 They also do breaks at 7, 14 and 28 days.\u00a0 They also test once daily each class of concrete they make.\u00a0 The density of their concrete is usually 2.3 ton\/cubic meter.\u00a0 Their machines can mix 3.5 cubic meters of concrete at a time, the trucks can carry between 7.5-9 cubic meters and they maximum productivity of the plant is 110 cubic meters per hour.\u00a0 They also source the stone and sand from two different quarries just in case there are any problems with the materials from one quarry.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-110 aligncenter\" src=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0628-e1470314501866-200x300.jpg\" alt=\"DSC_0628\" width=\"200\" height=\"300\" srcset=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0628-e1470314501866-200x300.jpg 200w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0628-e1470314501866-768x1152.jpg 768w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0628-e1470314501866-683x1024.jpg 683w, https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-content\/uploads\/sites\/2\/2016\/08\/DSC_0628-e1470314501866-1200x1800.jpg 1200w\" sizes=\"auto, (max-width: 200px) 85vw, 200px\" \/><\/span><\/p>\n<p><span style=\"color: #000000;font-family: Calibri\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The operation of Gerbera Ltd was very different than the operation of Marinski and it was very interesting to see both.\u00a0 But then again, they specialize in two different kinds of structures, high rises and low rises so naturally there will be some differences.\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Rachael here!\u00a0 Today we met with a man that could be considered a developer.\u00a0 He buys land and builds mixed use high rise buildings under the business of Gerbera Ltd.\u00a0 They usually contain commercial stores at the ground level with basements for the stores use and condos on the remaining floors.\u00a0 The number of &hellip; <a href=\"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/2016\/08\/04\/gerbera-ltd-high-rise-construction\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Gerbera Ltd. ~ High Rise Construction&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-106","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/posts\/106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/comments?post=106"}],"version-history":[{"count":2,"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/posts\/106\/revisions"}],"predecessor-version":[{"id":112,"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/posts\/106\/revisions\/112"}],"wp:attachment":[{"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/media?parent=106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/categories?post=106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stodorov.expressions.syr.edu\/bulgaria\/wp-json\/wp\/v2\/tags?post=106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}